    1.   Definitions in this terms and conditions “TOP” or Temporary Occupation Permit “Next Gen NBN” or Next Generation Nationwide Broadband Network “DB” or Distribution Board “FTP” or Fibre Termination Point “IRAS – Certificate of Numbering” is the house number and unit number of a Residential Premise, landed or high rise as     assigned […]

    read more
  • FAQs

    Submission of Request to NetLink Trust 1.  Where can the developer, building owner, licensed electrical contractor or homeowner submit a request for Fibre Readiness Certification? The developer, building owner, licensed electrical contractor or homeowner will need to visit this link to submit a request for Fibre Readiness Certification. 2.  When is the developer, building owner, […]

    read more
  • Fibre Readiness Certification Processes

    Process for obtaining the Fibre Readiness Certification for Landed Development without Main distribution Frame (MDF) room. 1.   Building owner, developer, homeowner and/or the licensed electrical contractor is to ensure that the lead in pipe from the meter compartment to the unit’s Distribution Board (“DB”) closet and from meter compartment to 1m beyond the roadside […]

    read more
  • Notification – Suspend Work

    Temporary Suspension of All Fibre Installation and Repair Work Date: Time: NetLink Trust’s Key Sub-contractor has temporarily suspended all fibre installation and repair work with immediate effect to safeguard the health of its workers as the haze situation worsens in Singapore. The current stop work order is applicable till further notice. NetLink Trust apologizes for […]

    read more
  • NetLink Trust Fibre Installation Terms & Conditions

    By submitting or, where applicable, authorising your tenant to submit, a Form (defined below) to us, NetLink Trust Pte Ltd, you signify your agreement to the terms and conditions in the Form and as set out below. 1.  Definitions. In these terms and conditions: “1st TP” means the first termination point within the Premises. “Agreement” means […]

    read more
  • Netlink Trust Fibre Installation Terms & Conditions

    By submitting or, where applicable, authorising your tenant to submit, a Form (defined below) to us, NetLink Trust Pte Ltd, you signify your agreement to the terms and conditions in the Form and as set out below. 1.  Definitions.  In these terms and conditions: “1st TP” means the first termination point within the Premises. “Agreement” means […]

    read more
  • Landed Property

    As a homeowner of Landed Property, how will the optical fibre will reach my home? For landed properties, the optical cable will be installed via SingTel’s existing underground pipe. This can be found running along the pavement and/or carriageway outside your house. If you do not have this, you will need to provide an underground […]

    read more
  • Cabling for network from Sept

    Source: The Straits Times 60% of homes and offices to be linked to high-speed network by December 2010 HOMES in the Macpherson, Jurong, Middle Road, and Geylang areas will be the first to be cabled up for Singapore’s next-generation high-speed network when installation works begin in September. The consortium laying the fibre-optic lines, NetLink Trust, […]

    read more